Wednesday, March 22, 2017

Building a Loop

For this week, we spent a lot of time prepping the track to be put together.  It took about 2-3 days to get one loop up and built for the bogie to be tested on.  The track still needs to be fine tuned since there are flaws.  Some parts do not have enough clearance for the bogie to run through. Others do not have enough clearance for the top bearings to clear.  There are small issues that can be fixed within the week. Below is a picture of the track that was built.