Wednesday, March 29, 2017

Ready for Paseo Prototyping

At this point, we are doing final touches to get ready for Paseo Public Prototyping.  We ground down some imperfections on the track.  Some of the U brackets extended above the lower track so those points had to be ground down with a Dremel.  Break down has been done for the track and ready for transport the morning of Paseo Public Prototyping.

No comments:

Post a Comment